Qualifications : LTS-E Technical College MTS-E Technical College HPS Technicum
General Experience
Involved in coordination instrument design-packages part at office and site location. Responsible for a draftsman/AutoCAD operator drawing packages in coordination with the Lead Engineer.
General Experience
Dec.2003 - Present: Controlec Engineering, Schiedam Instrument field designer Client: Odfjell Terminals Rotterdam
Project: CCR PID The existing control room CCR PID will be replace for a new control room at another location.
Scope of work To check electrical instrument connections of Unit-2, 5 and 6
Field activities To secure of instrument: control room layout front and rear panel layout location layouts fire and gas layouts cable layouts field junctionboxes crossboards wiring diagram auxiliary/relay cabinets
Field activities To secure of electrical: lighting layouts earthing layouts power layouts mcc connection diagrams heattracing junction box layout terminal diagrams power and lighting distribution boards
Client: Nam Gaag II Maassluis Site location Nam: Prepair all instrument drawings on site for as built.
Jun.2002 - Nov.2003: Lurgi Construction, Dusseldorf Essent (EPZ) Power plant location Instrument field designer Client: Essent (EPZ)
Project: HVG / Amer 9 Hout Vergassing
For detail engineering Support Lurgi engineering/construction site office team for revamp of HVG / Amer 9 building.
Field activities To secure of: co/co2 meassurement analyser meassurement multi core/single cables route junctionbox rack flow, pressure and temperature transmitters The convoy with meachanic with the villain work.
Design activities Design of instrument: data sheets co/co2 connection diagrams co/co2 location layouts location layouts field junction boxes loop diagrams hook ups cable list mdf cabinet package unit drawings prepair as built drawings
Design activities Design of electrical: lighting layouts earthing layouts electrical layouts mcc equipment layout mcc connection diagrams mcc data/equipment list heattracing junction box layout heattracing connection diagrams prepair as built drawings
Feb.2001 - Jun.2002: GTI Rotterdam Industrie b.v. Shell location Instrument field Designer Client: Shell
Project: F&U Metering Feedstock and Utility Metering
For detail engineering To place new adjustable flow meters with appurtenances pressure and temperature transmitters which connected to a flow computer cabinet.
Field activities To secure of: flow computer cabinet multi core cable route junction box rack flow, pressure and temperature transmitters The convoy with mechanic with the villain work.
Design activities Design of instrument: block diagrams layout of electrical instruments cable layouts field junction boxes cable layout control and auxiliary room cable list mdf cabinets loop diagrams connection diagram flow computer cabinet
Sep.2000 - Feb.2001: Kvaerner, Zoetemeer Instrument Designer Client; Dow Europe Pre-pair demolition drawings; Instrument block diagram, - layouts, - cable schedule, -cable schedule, - loop diagram
Design and update; New situation: block diagrams, - instrument layouts, - junction boxes, - instrument room layout, - i/o cross board racks, - instrument cable schedule, - instrument loop diagrams, - mounting details, - air piping details, - process piping and installation details
Feb.2000 - Aug.2000: Lyondell Chemical, Rozenburg Instrument Designer Client; Lyondell
Design and update; Instrument field layouts, - junction boxes, cable layouts, - equipment layouts, - block diagrams, - termination layout relay cabinet, - digital cross board wiring, - cable list, - start/stop and trip signals from irc cabinet to mcc compartment, - trip and annunciator alarms, - loop diagrams
Nov.1999 - Jan.2000: K-H Amec Engineering, Amsterdam Instrument Designer Client; DWR To built in a ups battery for back-up plc systems and watch dog (voltage guarding) power failure for 15 drain consort .
Design and update; Low voltae single line diagram, instrument main current scheme operating, PLC feeder/operating and measurement, existing arrangement cabinets, - switch cupboard, - terminal strip, Writing scope of works & field check at location for 15 drain consort.
Sept.1999 - Nov.1999: Controlec Engineering, Schiedam Instrument Designer Client; Kemira Pigments & DSM Brocades
Design and update; Instrument field junction boxes, - marshalling cabinets; - loop diagrams,- field layouts, - block diagrams, update instrument data and process list.
Apr.1999 - Sept.1999: Stork E & C, Rotterdam Instrument Designer Client; Dow Terneuzen, Emergo Revamp Furnance LHC-2 & LHC-3
Responsible for complete design packages of new drawings: Instrument block diagrams furnaces LHC-3 vfdp, - vfdp connection diagrams, - location layouts, - air supply manifold layouts, - air supply manifold take off, - details Update instrument line and data list LHC-2.
Aug.1998 - Mar.1999: ABB Lummus Global, The Hague Instrument Designer Client; Essar Oil Refinary, India
Responsible for complete design packages of new drawings: Instrument field cabling layouts, - cable tray layouts, - field junction boxes, - field location layouts, - equipment layout satellite building, - cable list. Check and mark-up vendor drawings for design of instrument layouts.
May 1998 - Aug.1998: Stork E & C, Schiedam Instrument Designer Client; Mahardi Upgrade Project, Al Furat
Design packages of existing and new drawings: Existing and new instrument block diagrams. Instrument cable layouts, - field junction boxes, - loop diagrams, - process piping details, - mounting details, - demolition drawings.
Jan.1998 - May 1998: K-H Amec Engineering, Schiedam Instrument Designer Client; Suiker Unie Revamp
Design packages of existing and new drawings: Instrument field location layouts, - cable layouts, - field location junction boxes, - junction boxes, - connection diagram signal and operator panels, - connection diagram graphic panels, - connection diagram marshalling cabinets, - block diagrams new and existing.
Jun.1996 - Dec.1997: John Brown, Zoetemeer Instrument Designer Client; Shell Revamp CC2/GP3&New plant Splitter/Treater
Design packages of existing and new drawings: Instrument field cable layouts, - field junction boxes, - field process connection layouts, - field cable tray layouts, cable list Design work ISS - Building (Aux. Room) Existing and new instrument cable layout, - mdf cabinets, - block diagrams, - loop diagrams, -instrument supply board. Field check at location and 5 month involved the work at the construction site Shell Pernis.
Jan.1996 - Jun.1996: Controlec Engineering, Schiedam Instrument Designer Client; Akzo & Kemira Pigments
Design packages of existing drawings: Instrument electric cable layouts, - equipment layouts, - field junction boxes, -existing and new instrument loop diagrams. Electrical design works: electrical power, lighting and earthing layouts, - block diagram, - connections supply to marshalling relay box, - start / stop signals from marshalling relay box to the variable speed converter.
Jun.1995 - Jan.1996: Fluor Daniel Consultants, Bergen op Zoom Instrument Jr. Designer / Designer Client; Shell PER + Project Butaan (S160), H2 Hydrogen (S912) and Flare (932)
Design packages of : Instrument block diagram, - layout auxiliary and control room, - supply board, - cable layout control and auxiliary room, - field junction boxes, - mdf cabinets, - loop diagrams, - cable list, - air lines and impulse lines metric.
Sept.1994 - Jun.1995: JGC Dordtse Engineering, Dordrecht Instrument Jr. Designer Client; Belgium Refinig Corporation, HDS-2 Modification
Demolition packages of: Instrument block diagram, - field location layout unit 600 & 700, - loop diagrams. Design packages of: Instrument block diagrams, - field location layouts, - loop diagrams, - connection diagrams. Modification of existing data sheets and pre-pair new data sheets. Client; Shell Chemie Pernis, CEOD / COF-3 Plot Clear Alarm Demolition packages of existing plot clear alarm layouts. Design packages of: Location of loudspeakers in combine with Shell. New plot clear alarm layouts. Plot clear field junction boxes. Writing plot clear alarm scope of works.
Apr.1994 - Sept.1994: Comprimo Belgie N.V. Antwerpen Electrical Designer/sr.designer Client; Sola Shell Chemie Norway
Responsible for complete design package of power,lighting and earthing layouts,single line diagram lighting and auxiliary distribution board,cable trench layouts,substations equipment layout,terminal rack interface cabinet E&I,cable routing layout beneath substations,lighting and earthing layout substations, mark-up all cable lists for this project.
Jun.1992 - Mar.1994: Abb Lummus Crest, Voorburg Electrical Designer/sr.designer Electrical Designer Client; Petrogal Company Portugal
Responsible for complete design package of revamp work for: Electrical power, lighting and earthing layouts. Design demolition pakages.
Client; Elf Petroland Responsible for complete design package: Electrical power, lighting and earthing layouts, - blockdiagrams, - connection diagrams, - arrangement panels for mcc, battery and generator room, - heattracing isometric. Design demolition pakages. Client; NAM Responsible for complete design pakage: Electrical lighting, earthing, power layouts for plant and miscellaneous buildings. All main and sub junction boxes, cable tray layouts and check vendor workprints.
Aug. 1988 - Jun.1992: Dow Europe, Rotterdam Electrical Designer Client; Dow Projects
Design lighting, power, earthing layouts, circuit and terminal connection diagram, ligthing main and sub-junction boxes, communication block diagrams, lighting calqulation for substations; cable tray, earthing and lighting layout substation Design demolition pakages.
Jan. 1988 - Aug. 1988: Controlec B.V. Schiedam Electrical Designer Client; Shell Chemie
Writing requisition for electric motors,switches,low and high voltage cables. 10 and 25% job calculation of Azodrin production installation,replace steam turbine to electric motors. Writing scope of work job calculation. Design lighting,power,earthing and trench layouts.
May 1987 - Jan. 1988: Matthew Hall Keynes, Schiedam Electrical Designer Client; Parenco paper factory
Commissioning of PM1 , TMP line A and B Visual test: Check instruments and motors according to instrument and motor list to determine manufacture and type. - for correctness of instrument,motor and switch installation. - cable installation (cable glands and tensions relief installation) - if installation in accordance with NEN requirements. - for presence and correctness of nameplates. Report any deviation on test report.
Comissioning/DRY TEST Check if cables/wires are installedon correct terminals and modify any mistakes. - if main switch is in " 0 " position. - if fuses in main circuit are correct. - if thermal setting is set right,if not correct adjust in accordance with the id-tag. - if electric motor is mechanically uncouppled from the driver. - if entire installation is technically sound. - all instrument and motor signals from terminal rack to input/output of plc.
WET TEST This was done in cooperation with the project group of Parenco. The starting up and commission of the first individual groups of PM1,TMP A and B. This included correcting all problems,which presented themselves during start up and operation. Also shift work was performed as a troubleshooter together with the Parenco operators.
May 1985 - May 1987: Siemens Nederland N.V. The Hague Electrical Designer Client; GEB Rotterdam Electricity Power Plant Maasvlake 1&2
Design and drafting of circuit diagram of 4-burners of the boiler solenoid valve drive,pressuer valve,hardware cabinets,contents of these cabinets such as: sae terminal arrangements,power ditribution of the prints,apparatus list,power distribution in the power supply test cabinets,marshalling-supply cabinets.
Field works: 9 months This work entailed the verification of: Arrangement drawings for distribution cabinets,instrument arrangement of distribution cabinets,instrument location according to PID and instrument layout,connection diagrams, checking of cables,cable connections of distribution cabinets and instruments,preparation of as built drawings of cable trays and cable layouts.
Sept. 1984 - May 1985: Badger B.V. The Hague Electrical designer Client; Conoco Oil Company
Design and drafting of platform lighting,power,earthing layouts. piperack lighting layouts,trench layout, power and earthing layout control house and substation. Exchanger structure and pump skid lighting,power and earthing layouy.
Feb. 1984 - Sept. 1984: Fluor Ned. B.V. Haarlem Electrical designer Client; Esso Flexicoker
Design and drafting of lighting layout for finfan air coolers, heaters vacuum structures,pump area's and also for power, earthing and trench layouts. Lighting panel schedules and all revamp works for area 32,33,35
Sept. 1984 - Feb. 1984: Protech International B.V. Schiedam Electrical designer Client; NAM
Design and drafting of earthing,power,lighting and instrument layouts for protection platform " Ameland Westgat "
Feb. 1983 - Aug. 1983: Gota Verken Arendal Gotenburg Sweden Electrical designer Client; Britisch Oil Company
Design and drafting for Gotmodul works: Lighting and small power, P.A.,entertainment,telephone and tv system for all levels in the livingquarters (offshore). Testloop diagram for fire dampers and fire & gas system, electrical heating and ventilation,normal and essential distribution board. Punch all the cables and electrical equipment in each modules.
Field works: Checking all the cables connection in the junctionboxes for normal and essential lighting,fire & gas,fire dampers,heating and ventilation,cables in the mcc board (switch room). Checking all motor connection,equipment,cables and connection in the junctionboxes,panels in the plantroom,galley,cold store chiller. Punching transit cables for all levels. Marking all drawings for as built.
Oct. 1982 - Jan. 1983: Kellog Continental, Amsterdam Electrical designer Client; Shell Refenery Australia
Design and drafting of lighting,earthing,power and cable tray/trench layouts. Lighting sections and elevations cable tray/trench cross-sections. Lighting,power details and material take off.
Apr. 1982 - Sept. 1982: Holec West Projects, Gouda Electrical jr.designer/designer Client; Holec West Projects
Design and drafting motor control schematic,one line diagram, earthing layout and details,instrument layout and loopdiagrams.
Sept. 1981 - Mar. 1982: Protech International B.V. Schiedam Electrical jr. Designer/Designer Client; Aramco Oversea
Design and drafting of block diagram,interconnection diagram, power,lighting and earthing layouts,elementary diagrams. Material take off.
Apr. 1981 - Sept. 1981: John Brown, Zoetemeer Electrical jr. Designer Client; Amoco
Design and drafting of panel layout relay cabinet,power,lighting, earthing and lightning layouts. Block and elementary diagram.
Jul. 1978 - Mar. 1981: Lummus Nederland, The Hague Electrical jr. Designer Client; Aramco Oversea
Design and drafting of electrical power,control,lighting and grounding system. One line and elementary diagrams. Power,lighting and control off-sites. Lighting piperacks and platforms material take off.
Feb. 1978 - July 1978: Stone and Webster, Rijswijk Electrical Draftsman/Designer Client; Aramco Oversea
Design and drafting of electrical power, lighting and grounding system. One line and elementary diagrams.
Nov. 1977 - Jan. 1978: Matthew Hall Keynes, Schiedam Electrical Draftsman/Designer Client; Esso Refinery
Design and drafting of electrical power / instrument diagram and power,lighting and grounding layouts.
Mar. 1977 - Nov. 1977: Crawford & Russel, The Hague Electrical Draftsman/Designer Client; ICI Chemicals
Design and drafting of lighting ,power,grounding layouts,elementary and block diagrams.
Sept. 1972 - Feb. 1977: Matthew Hall Keynes, Schiedam Electrical Draftsman Client; Shell Chemical,Esso Refinery and ICI Chemical
Design and drafting of lighting ,power,grounding layouts,elementary and block diagrams.
Curriculum Vitae: |