Inloggen mijn CV

Gebruikersnaam:
Wachtwoord:
No Title
cv: 7622

  Reageer per email op dit CV.
  Bel ons direct voor bemiddeling.

Functie: Project Management / Engineer
Beschikbaar in overleg
Zoekt: passend werk
Opleiding:

Vakkennis:

Ervaring:

QUALIFICATIONS : HTS Electrical Engineering 1961-1966
Application Course Instrumentation 1970-1971
Management Course ISW 1977
M.Sc. Electrical Engineering 1997- 2000

Various Post Graduate Courses with reference to:
EHV distribution, Protection systems, Generation, Large Rectifiers, Instrument Control, PLC and Computer Control systems, MCC's,
Multi Motor Solid: State Drives, Safety, Project Management Control, Telecommunication, Quality Audit Inspection and Control.
Waste Heat recovery, Environment control

LANGUAGES : Fluent in Dutch, German, English, French, Spanish, fair in Italian.

EXPERIENCE : More than 37 years experience in Electrical, Electronic and Project Management Engineering for a wide range of facilities including: Grass root refineries, oil and gas production facilities, gas and oil pipelines including booster stations, natural gas compressor stations, chemical and polymer plants ,multi spinning machines, extruders, bitumen plants, food industrial plants, utilities facilities, telecom projects, electrical power generation plants, aluminium factories and production facilities, Major Airport electrical facilities and utilities , information technology, large heating facilities for multi nurseries connections,.
GSM, GPRS, UMTS network planning and construction, one antenna Principe development, large WLAN-WIFI installations

GEOGRAPHICAL : Includes Europe, the Middle and Far East,
AREAS OF WORK: Africa, North and South America.


KNOWLEDGE OF : NEN, VDE, VDI, DIN, NBN, NFC, CEI, BS,
THE FOLLOWING: ANSI/NEC, CSA/EEMAC, ITU, FAA,
STANDARDS: ICAO, IEC/ISO.


September 2007: Aker Kvaerner Rotterdam, The Netherlands
Present

- Lead Electrical Engineer
Responsible for Koch B.V. Naphtah Splitter

- Low voltage extension with several cubicles of Motor
Control Centre
- Purchase of self regulating heating tape
- HVAC Installation
- Cables and cable support media
- L.V. control systems
- Hazardous area Map preparation
- Lighting and small power
- Overhead Cable run through the plant extension
- Connection of motors


Nov. 1999: AMSTERDAM AIRPORT SCHIPHOL, THE NETHERLANDS
August 2007
Senior Consultant Engineer / Project Manager

Department A/TRE/ISM
- Millennium provisions, power, communication, drinking
Water, heating, firewater and sewage, Emergency communication network. Preparation of Manuals.
- Engineering support WAC-4 (Generator and Heating/Cooling plant)
- New development electrical substations for future H and J Piers inclusive Terminal 1 and 3 extension
- Development for Schiphol wide glass fiber network (Ternet)
- Luggage reclaim rooms de-bottlenecking
- Bass system 70 mbs
- Future Schiphol electrical HV and LV distribution
- D-Buffer Firewater Storage and power supply
- Screening Engineering specifications for APM (Automatic People Mover)
- Frequency Conflict Calculations Airport Communications
- Large Lighting saving projects
- Development of SPL2000 systems for Schiphol wide usage
- Various type of communication systems at various locations


Jan 1999- Nov 1999: ORANGE N.V. (a division of France Telecom) THE HAGUE
THE NETHERLANDS

Project Manager

Dep't M.L.L.

Responsible for the Engineering, Construction of a large 1800 MHz GSM telephone indoor project using a fiber network and mini BTS stations at the premises of Schiphol Airport..
Project was a common project For Providers "T-Mobile and Orange"
It is the first large indoor project using this technique in the Netherlands
Advantages: Low EMC radiation and perfect coverage easy to expand in the future.
Various constructions for BTS locations at Schiphol Airport
Development for Tunnel installations


July 1997- : AMSTERDAM AIRPORT SCHIPHOL, THE NETHERLANDS
Dec. 1998
Senior Consultant Engineer / Project Manager

Department C/SFM/DA

- Basic utilities provisions 1998
- D-Pier extension of electrical power by
Means of various KWS stations
- Development of a new B-Pier
- Risk analysis fuel loading system
- Terminal 1 and 2 Lounge central
- VIP centre development
- Generation of heat and electrical power
WAC-4
- Study Fuel cell implementation for building heating
And electricity
- PTT Traxys network for radio communication
At Schiphol premises.
- Member of the Frequency Platform


VARIOUS PROJECTS FOR AMSTERDAM AIRPORT SCHIPHOL, THE NETHERLANDS

Jan 1997 - : Senior Consultant Engineer
Feb.1997: Services to A/INS Department

Additional study and preparing specifications for a mobile 180 kW 400 Hz electrical power facility concept, providing electrical power for various types of airplanes

July 1996 : AMSTERDAM AIRPORT SCHIPHOL, THE NETHERLANDS

Senior Consultant Engineer

Assignment via SMS (Schiphol Management Services dep't of Schiphol International) to:
SERCO LTD. EAST INDONESIA AIRPORTS PROJECT, JAKARTA INDONESIA.
Set up of a Training program for the technical staff of Department voor die Kommunikatie.

Set-up for additional courses for Diploma 2 and 3 electrical and electronic maintenance personnel including interviews held at various Airports in Indonesia.


Jan 1995 - : AMSTERDAM AIRPORT SCHIPHOL, THE NETHERLANDS
March 1995
Senior Consultant Engineer

Additional Feasibility study for fixed 400 Hz Electrical Power Facilities for all Amsterdam Airport yet ties.
Preparation of functional design documents for the installation and inquiry documents.


1994 - July1997: ENERGIE DELFLAND, DELFT, THE NETHERLANDS

Senior Electrical Project Engineer

Assigned to the WCO project providing from EZH ROKA 3
280 MW generator at Capelle a.d. Yssel 250 MW heating and CO2 for 138 Greenhouses in the Bleiswijk and Bergsehoek area.

Responsible for the digital control network configuration, process control development and implementation, staging of token ring systems, engineering and construction of a 16 Km fiber Communication network with all peripheries this for the remote metering and remote control of all 138 heat and CO2 supply stations at Bleiswijk, Zoetermeer, Pynacker, Delfgauw and Delft.
Project is unique of its kind in the Netherlands.


1991 - 1994 : AMSTERDAM SCHIPHOL AIRPORT, THE NETHERLANDS

Senior Electrical Project Engineer

Assigned to the Schiphol PBS/ SPC Organization, Department Vital Provisions.

Responsible for Supervision of Engineering, Design and Construction, Testing and Commissioning new airport facilities for the first increment period concerning: -

New 50/10 kV Main Substation, capacity 90 MVA including central control panel, metering and protection system

- Complete new 10 kV electrical Main Distribution System for the airport facilities

- Various new 10 kV Sub-stations inclusive low voltage distribution stations.

- Co-genplant for the new terminal west building inclusive distribution system.

- Major renovation projects, feasibility studies and consultancy services

- 400 Hertz Central Electrical Power Provisions for Wide Body Airliners at the "G" jetty using High Efficiency low harmonic producing Solid State equipment.
Project is still unique in its kind.

- Preparation of Specifications for equipment, Construction, Test and Commissioning


1990 - 1991 : DEERNS - NACO (VOF) RAADGEVENDE INGENIEURS B.V., RIJSWIJK, THE NETHERLANDS.

Project Engineer Electrical & Communications

Responsible for engineering and design new airport facilities RSAF site 2 and site 4 Airports, Kingdom of Saudi Arabia,
Concerning: -


- Group shelters
- Last Chance Aprons
- Fuel stations and pump stations
- Airfield lighting, taxi track lighting CCR (constant current regulators)
- Water plant station consisting of deep water wells, elec. dialysis plant, water storage and booster station;
- Hot pit aircraft refuelling stations
- Fire building
- Fault and signalling building
- Ammunition stores
- Communication network consisting of scramble phone network (optical), airbase phone network
- New 13.8 kV Diesel driven electrical PowerStation complete with control panel, MV Switchgear, protection relay panel, LV switchgear;
- Various MV distribution systems and substations;
- 400 Hertz and 28 VDC systems
- Preparation of specifications, test procedures and installation instructions for the above.


1989 - 1990 : HOOGOVENS TECHNICAL SERVICES (HTS), YMUIDEN
THE NETHERLANDS. (Formally ESTS.)

Project Engineer Electrical and Instrumentation,

Member of EGD project team for the Development of a new 220 kV Intake Station "HEVESKES".

Responsible for the Electrical and Instrumentation Engineering for a new aluminium production plant located in Delfzijl The Netherlands concerning:
- A new 180 kA aluminium pot line system to be located into two large factories including all associated equipment.

- Anode rod-ding shops

- Various 10 kV and 3 kV substations

- Various 400 Volt Substations

- Water treatment plant

- Fume gas treatment plant
Preparation of specifications and purchase orders for:
- New 220 kV GIS Switchgear (8 cells)
- 4 each. 90 MVA, 220 - 66kV step-down transformers.
- 4 pcs. 90 MVA, 66 - 0.91kV rectifier transformers
- 4 pcs. 1120V, 67kA rectifier installations.
- 2 each 25 MVA, 220 - 10kV auxiliary transformers.
- Various 10kV switchgears
- Various 10 - 0.4kV transformers
- Various low voltage distribution systems
- Complete Process Computer system inclusive
Communication network to control 240 each.
PLC - Systems.


1984 - 1989 : JOHN BROWN ENGINEERS & CONSTRUCTORS B.V. ZOETERMEER, THE NETHERLANDS

Principal Electrical Engineer

Responsible for a wide range of projects including:
- Departmental supervision for DU-PONT European Centre of Engineering at Zoetermeer including feasibility studies, electrical engineering and consultancy for Large Polymer plants, chemical factories, spinning plants, large extrusion plants, material handling plants, foil and stretch wrapping plants, chemical dosing plants, pesticide and fungicide production factories inclusive loading/unloading areas.

The responsibility included:
- Load studies, Short Circuit Analyses, HV and LV distribution systems, protection control systems.

- Project Automation Control, engineering Quality Control Audits inclusive design checks

- Computer controlled Solid State Drive's study

- Preparation of Specifications and Material Requisitions Purchase orders.

- Engineering Analysis and Quality Control

- Vendor evaluation, Quality Audits, Selection, Testing and Inspection.

- Training personnel.

- Preparation of departmental specifications for Quality Control Engineering manuals to be used by each member of the
Staff.


OTHER EXPERIENCE - JOHN BROWN E + C

CPC SAS VAN GENT, THE NETHERLANDS

A Wheat Processing Plant project for CPC,
Sas van Gent, The Netherlands involving Transformer Stations, HV and LV distribution systems, Communication and CATV systems, etc.

- Complicated Protection and control associated with required modifications to the existing HV installation.

DU PONT DE NEMOURS GMBH, UENTROP, GERMANY

Responsible for Engineering, Purchase and Design for:-

- New Cooling Water Expansion Project, involving a new 20 kV substation, 400 V Switchgear and Motor Control Centres.

- LV Distribution system for a large Mechanical Handling Project.

- Heat tracing project for Salt lines and Salt house.

- Various Consultancy Services.


DU PONT DE NEMOURS UK Ltd., Maydown, Northern Ireland.

Responsible for Engineering, Purchase, and Design involving:-

- Polymer Extension involving various SLD's, 415V Motor Control Centres and controls for Automation.

- New Spinning Machines existing of large multi motor Solid State Drives, procescontroled heating systems, 415 V Switchgear
And Motor Control Centres.

- Heating and Ventilation revamp spinning room.

- Consultancy services for various projects.


Continuation Du Pont de Nemours Maydown
N.Ireland.

- Feasibility study for computer controlled single motor solid state driven Spinning Machine including MV and LV Distribution system for an expansion project.


DU PONT NEMOURS NEDERLAND B.V. DORDRECHT

Responsible for Supervision Engineering, design and purchase for:-

- New Spinning Machines involving Large Solid State Multi Motor Drives, Power Distribution for Heating Systems and Electrical Consumers.

- Polymer expansion project involving various large SLD's.

- New 12 kV - 400 Volt Substation Extension

- Feasibility study for new Spinning Machine motors and computer controlled single motor solid state driven equipment.

- Consultancy service for various projects.


DU PONT NEMOURS S.A., MECHELEN, BELGIUM

Responsible for engineering purchase and design for:-

- Expansion of compounding facilities consisting of raw material storage, two large extruders including heating control, special weight control and dosing equipment.

- Large multi 400 Volt Low voltage Switchgear and Motor Control Centres.

Special Siematic instrument control systems.

- Consultancy service for various projects.


DU PONT DE NEMOURS S.A., CERNAY, FRANCE

Responsible for Engineering Design and purchase for:-

- New Purification plant H-6573 inclusive new storage area and unloading facilities.

- Revamping existing installation.

- New low voltage switchgear and motor control with integral starters suitable for computer controlled process.

- New Process Computer installation.

GENERAL ELECTRIC PLASTICS, BERGEN OP ZOOM,
THE NETHERLANDS

Consultant

Staging Process Computers PPO Plant and resin plant


1973 -1984 : KING- WILKINSON INTERNATIONAL B.V.
THE HAGUE, THE NETHERLANDS.

Senior Electrical Engineer/Consultant Engineer responsible for a wide range of projects including feasibility studies, electrical engineering and consultancy for grass roots refinery projects, bitumen plants, crude oil stabilizers, high pressure boilers, power generation plants, gas oil separator plants, crude oil storage plants, onshore gas/oil pipe lines, pump stations, utilities, large electrical power stations, O/H electrical power lines, telecommunication projects, solid state control systems and computer control, scada systems etc.

This responsibility includes:
- Load studies, Short Circuit Analyses, HV and LV distribution systems, protection control systems.

- Solid State and Computer Control systems telecommunication systems and Scada systems.

- Direct supervision of the engineering effort and general supervision to the design effort.

- Material specifications.

- Technical and commercial review of bids EA/QA.

- Vendor evaluation, Quality Audits, Selection, Testing and Inspection of Electrical, Electronic, Telecom and Computer equipment including Quality Control.


1969 - 1973 : BECHTEL INCORPORATED, THE HAGUE,
THE NETHERLANDS.

Senior Designer

Responsible for electrical design and solid state control systems for refineries, chemical plants, electrical power plants, natural gas compressor stations and large crude oil storage facilities.


1968 - 1969: NATIONAL SERVICES


1966 -1968 : MENTOR B.V., THE HAGUE, THE NETHERLANDS

Electronic Engineer

Development for City Common Arial Systems, Closed Circuit Television systems, link transmission systems and transmitters.


OTHER EXPERIENCE - KING-WILKINSON
KW-80361 : National Nigerian Petroleum Corporation (NNPC) New Port Harcourt Refinery (Grass Route Refinery)

Consultant Engineer

Preparation of refinery general specifications for generators, HV/LV switchgears, transformers, HV/LV motors, cables ,lighting, EExd and EExe equipment, UPS systems, VHF/HF radio networks, telecommunication equipment and network, power distribution schemes, technical and commercial bid reviews contractors document,

KW-80451 : Veba Oil / Statoil MTBE Plants

Consultant Engineer

Feasibility Study for MTBE Plants in Norway and Germany.
Preparation of all electrical specifications and documents including Steam balance for new steam turbine generators.
Bid review commercial and technical.

KW-13141 : Sonatrach Algeria
48 Inch Gazoduc Algeria-Tunisia-Italy

Consultant Engineer member PMT team.

Review of contractual documents

Review and approval of contractors engineering specifications design and construction documents.

Quality Audits and inspection by material suppliers and construction companies.

Testing and inspection (Quality Assurance) of electrical generation, distribution, cathodic protection systems, telecommunications , telemetering , Process computers associated with the pipeline project.

Construction supervision for electrical, telecom installations and process equipment.


KW-14492 : GIPC Bahrain Ammonia / Methanol Petroche-
mical Plant

Consultant Engineer

Preparation of all general electrical specifications for electrical equipment.

KW-12493 : TIPER REFINERY DAR ES SALAAM TANZANIA
TANZANIA BITUMEN PLANT.

Senior Electrical Engineer Assigned to
United Nations Technical Development Organisation

Responsible for complete electrical engineering.


KW-00991 : AHWAZ AND KERMANSHA POWER GENERATION PRO-JECT - IRAN.

Electrical Engineer Assigned to ACEC Belgium.

Responsible for engineering and design fuel storage area, fuel pump area, plant lighting and cathodic protection system.


CONSULTANCY AND FEASIBILITY STUDIES
VARIOUS CLIENTS:
DEUTSCHE DEMINEX
Feasibility studies for Deminex EE85 field Development and preparation of electrical specifications.

VEBA OIL, various projects in Germany,
Republic of Libya and Venezuela

CF-BRAUN / SANTA FE, Projects in the
USA /CANADA, Kuwait, Qatar, Oman and
Venezuela.

Government of Malaysia, evaluation project
Checking lump sum variables, large LNG project.

International Court of Arbitration Paris,
Refinery Project Point Noire, Congo Africa.

SHELL ELF GABON, AFRICA, Various consultancies
For Port Gentil - Libraville


Continuation Various Consultancy and Engineering.

Pertermina Indonesia, various training projects.

Petromin Saudi Arabia, personnel training

Petrobras do Brasil, offshore development

Tebodin the Hague ,the Netherlands,
Feasibility study for solar power well head cathodic protection Libya.


OTHER EXPERIENCE - BECHTEL INC.

Oasis Oil, Libya, design and preparation of documents for a large telemetry project to control unattended power plants.

Texaco Refinery Rotterdam, the Netherlands
Engineering and design for crude oil terminal Nieuwe Sluis and modernisation of existing refinery and transpumphouse

Maatschap Europoort Rotterdam, The Netherlands,
Partial Engineering and design for crude loading system, crude storage area and telemetering system.

Petroland Grouw, The Netherlands, design natural gas treatment plant.


A.J.F.J. van Wees

cv: 7622

  Reageer per email op dit CV.
  Bel ons direct voor bemiddeling.


vrijdag, 22-11-2024, 01:20:51